Tuesday, January 5, 2010

Third Floor nearly complete

Work is nearly complete on the third floor of the Carpenters Center. The flooring has been installed, which includes carpet in the offices and hallways, hardwood in the lobby, linoleum in the storage closets and cork in break room.



Architects from ADD, Inc. completed a walk around of the third floor last week and created the punch list for the floor. During a punch list walk around the architects look for things such as nicks in walls, scratches in the paint, light bulbs that need replacement, defects in products, caulking and seal of windows, and door lock function. A list is created of every item that needs to be addressed and yellow sticky notes are attached to the area to specify location.


Yellow sticky notes mark punch list items.

The various trades will respond to the punch list and make the necessary repairs and finish work.

Once the punch list is complete the final cleaning for the floor will begin. After the cleaning, each room will be locked shut until the furniture is moved in, which will happen in late January.

While crews work on punch list items, carpenters working for Pappas Co. began installing venetian blinds throughout the floor.





A little over a year ago....

Monday, January 4, 2010

Carpenters Going Green: Point Breakdown Category 4- Materials and Resources



Prerequisite 1, Storage and Collection of Recyclables: The Carpenters Center will have recycling areas that serve the entire building for paper, corrugated cardboard, glass, plastics, and metals. Storage rooms for the recyclable materials are provided on levels 1,2, and 3.


3 Points Attained

1. Construction Waste Management – divert 50% from disposal
2. Construction Waste Management – divert 75% from disposal - Suffolk Construction implemented a Construction Waste Management Plan as a means to ensure that a minimal amount of waste debris is disposed of in a landfill, and that all LEED requirements are met.

3. Recycled Content – 10% by cost (post-consumer + ½ pre-consumer) - A minimum of 10% of the total materials cost needs to be the recycled content value of the project.

Post-consumer and post-industrial recycled content is in the building’s materials and products. Some materials and products that contain recycled content include structural steel, carpet, flooring, and acoustical ceiling tile.


This box of carpet squares reads:
"High Recycled Content. 100% Recyclable."

98%!

As of January 4th, construction of the Carpenters Center is 98% complete!                           

Thursday, December 31, 2009

Carpenters Center catches Globe's eye

The Boston Globe and Boston.com today featured a story about the Carpenters Center being built by the New England Regional Council of Carpenters.
Motorists stuck on the Southeast Expressway soon will have something besides radios and cellphones to grab their attention: trainees learning carpentry at the new Carpenters Center in Dorchester.

The striking $19 million, 75,000-square-foot home of the New England Regional Council of Carpenters is being readied for a Feb. 1 opening on the edge of the expressway. At drivers’ eye level, and less than 30 feet from the southbound travel lane, will be oversize windows that look in on the training center for area carpenters.
The entire story can be read here

Monday, December 28, 2009

Carpenters Going Green: Point Breakdown Category 3- Energy and Atmosphere

8 Points

1. Optimize Energy Performance Exceed the American Society of Heating, Refrigerating and Air-Conditioning Engineers ASHRAE 90.1 Energy Standard by 10.5%
2. Optimize Energy Performance Exceed ASHRAE 90.1 by 14%
3. Optimize Energy Performance Exceed ASHRAE 90.1 by 17.5%
4. Optimize Energy Performance Exceed ASHRAE 90.1 by 21%
5. Optimize Energy Performance Exceed ASHRAE 90.1 by 24.5%
6. Optimize Energy Performance Exceed ASHRAE 90.1 by 28%
7. Optimize Energy Performance Exceed ASHRAE 90.1 by 31.5%

The Carpenters Center was modeled in order to predict how much the design of the building would save money in energy use per year. Comparing it to a typical building using the ASHRAE 90.1-2004 Energy Standard, the project uses 31.5% less energy then a typical building



8. Enhanced Refrigerant Management - all HVAC units for this project are specified to use R-410a refrigerant, and therefore do not use either Chlorofluorocarbons (CFCs) or Hydrofluorocarbons (HCFC) refrigerants.

Wednesday, December 23, 2009

Then and now

February 2009



December 2009