Tuesday, February 17, 2009

Interior Partitions Removed

The demolition of the interior partitions on the first and second floor is complete, including masonry, metal stud and drywall. The debris was separated for recycling, as part of the LEED certification process.


The second-floor interior during demolition of the interior partitions.

The debris is removed from the interior of the building and then loaded into dumpsters located outside. As the debris is dropped outside, it is sprayed with water to prevent the spread of dust through the air (pictured below).



Following this cleanup, NASDI will remove the air handlers on the roof, such as air-conditioning and heating units, and then the entire roof will be removed. This will happen from the interior of the building. An excavator with demo claws will be brought into the second floor to take the roof off the slab.