Q-decking is being shot down to the steel beams of the third floor. The decking provides a stay-in-place form for the concrete slab of the third floor.
This is a view looking up at the Q-deck attached to the steel beams.
Along the west side of the first floor, concrete block is being put in place by masons working for M-Fal Masonry. The retaining wall of the parking deck is behind the concrete block (seen here).
The first floor mechanical, electrical and plumbing work is ongoing.
![](http://lh4.ggpht.com/_u9Swmp13i7M/ShRUqTDKcAI/AAAAAAAABQ0/aaYhq5MQglM/s288/5_20_09%20032.jpg)
No comments:
Post a Comment